- Repair of electrical equipment and facilities damaged.
- Change light coin, either the bulb, starter or choke problem
- Change the wall fan was rusty and failed entirely to the new.
- Follow contractor Leong from Blue Chip Engineering SDN BHD doing preventive maintenance for main sub-board (MSB) and distribution board (DB) at new intensive care unit (ICU). Record the reading for voltage and currentload.
- Change the damage bell switch.
- Change the fan from the old coins that are rusty and not work as well as problematic (difficult to operate its motor) to the new
- Find the cause of damage to the circuit that causes the MCB trips (doctor hostels). One of the two gang two way switch for the corridor lamp is burn out.
- Change the triplex bulb
- Change the damage telephone to the new one at security unit.
- Change the burnt emergency lamp at x-ray unit.