- Repair of electrical equipment and facilities damaged.
- Change light coin, either the bulb, starter or choke problem
- Repair water sprinkler timer. Mistakes in connecting between contactor and normally open.
- Repair the leaking and not functioning water heater. Changing the rubber around its nut coil.
- Perform a PPM for printers. Ensure that the device can function properly. Make sure the connection is properly and safely. Clean the equipment from dirt, dust and scratches.
- Repair stuck fax machine. Can not accommodate too many piece of paper.
- Change the damage power supply’s fan.
- Attending testing and commissioning (T&C) meeting for new surgical light.
- Have a visit to new A&E project to take a look on the new DB for normal supply.
- Find the cause of damage to the circuit that causes the MCB trips (x ray unit). X-ray unit gets the normal supply from new DB at A&E project. Suspected that it has problem with the new wiring.
Friday, June 25, 2010
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment